Physique Of Final Lacking Employee Recovered In Chamoli, Rescue Ops Finish
&w=1200&resize=1200,0&ssl=1)
Uttarakhand Avalanche: Contemporary particulars have emerged from Uttarakhand’s Chamoli, the place the physique of the final lacking particular person was discovered on Sunday. With the newest discovery, a rescue operation in Mana village, the place an avalanche struck a BRO camp, culminated, Lt. Col. Manish Shrivastava, PRO (Defence) Dehradun, mentioned.
Earlier within the day, three extra our bodies had been discovered as rescue groups continued looking for the final lacking employee. “All 54 individuals have now been rescued or recovered. This marks the fruits of the Mana Village Rescue Operation,” Shrivastava mentioned.
Mana (Chamoli) avalanche incident | The final lacking particular person’s physique has been discovered. All of the 54 individuals have been rescued/recovered. The restoration marks the fruits of Mana Village Rescue Operation: Lt Col Manish Shrivastava, PRO (Defence) Dehradun pic.twitter.com/1X7WFrF5AV
— ANI (@ANI) March 2, 2025
Because the search operations continued in Uttarakhand’s Chamoli on Sunday, the Military recovered two extra our bodies within the snow from the positioning of the avalanche that struck a BRO camp close to Mana village. The efforts are nonetheless ongoing to find the final remaining employee who remains to be lacking. Earlier, our bodies of BRO (Border Roads Organisation) staff retrieved from the avalanche web site had been airlifted and delivered to Joshimath.
#WATCH | Mana (Chamoli) avalanche incident: Our bodies of BRO (Border Roads Organisation) staff retrieved from the avalanche web site airlifted and delivered to Joshimath.#Uttarakhand pic.twitter.com/H0MgJuntFA
— ANI (@ANI) March 2, 2025
Rescue personnel used thermal imaging cameras and helicopters to help of their search operations, which started for the second day this morning. Nevertheless, rescue efforts had been halted because of snowfall on Saturday night.
Uttarakhand Chief Minister Pushkar Singh Dhami mentioned this morning that the search and rescue operation for the lacking staff is ongoing. A number of forces, together with the Military, ITBP, Air Power, NDRF, and SDRF, are working collaboratively to help. He additional acknowledged that ground-penetrating radar, thermal imaging cameras, and victim-locating cameras are being utilized to find the lacking staff.
He talked about that climate situations within the space are bettering, however the potential for avalanches stays excessive, prompting authorities to halt work in high-altitude areas as a precaution.
Earlier at the moment, Chamoli District Justice of the Peace Sandeep Tiwari mentioned, “Yesterday, medical doctors confirmed 4 deaths. Earlier, the full quantity was 55, however now we have now the knowledge that one of many staff was on unauthorized go away, and he’s dwelling. The overall quantity has been diminished to 54, out of which 4 individuals are nonetheless lacking,” as quoted by ANI.
A Mi-17 helicopter airlifted a drone-based clever buried object detection system for search operations at the moment, in response to the Indian Air Power. Injured BRO staff are being airlifted for additional remedy at Joshimath Military Hospital. IAF Cheetah helicopters have been engaged in rescue operations since Saturday.
(With businesses’ Inputs)